All media
38 items. Videos and audio load only when you press play.
| Title | Type | Sections | Format | Size | Added |
|---|---|---|---|---|---|
| Milner Gas Power Plant (South Hills): Inconsistencies in the RecordSeries: South Hills - Milner Project · Part 1Mini brief · Revision 2, status as of Nov. 19, 2026. Statements in the record set side by side that can't both be fully right as written, and which ones the record now settles.draft-milner-gas-power-plant-inconsistencies-mini-brief-rev-2-4222ae.pdf · Download | Document | Energy, Local & State, Research | 147 KB | November 22, 2026 | |
| Milner Gas Power Plant (South Hills): Expanded BriefingSeries: South Hills - Milner Project · Part 2Research file · Revision 3, status as of Nov. 19, 2026. Quick answers and the full record on Idaho Power's 222 MW gas plant next to Milner Dam: what it is, where the PUC case stands, the permits, the pipeline and the open questions.milner-gas-power-plant-expanded-briefing-rev-3-6873ef.pdf · Download | Document | Energy, Local & State, Research | 1.5 MB | November 22, 2026 | |
Milner Evidence Short 1: Only a Building PermitSeries: South Hills - Milner Project · Part 3Vertical short, 1:28. The documents behind Milner Gas Power Plant video 1, on screen: Idaho Power's own testimony that, at this time, a conditional use permit is not required in Twin Falls County, only a building permit, and its project page on noise with no decibel figure. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-01-up-to-222-megawatts-idaho-power-says-the-county-requires-only-a-building-permit-v1-19mb-1aa9b0.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.6 MB | November 19, 2026 |
Milner Evidence Short 2: Bid as a Battery, Swapped for GasSeries: South Hills - Milner Project · Part 4Vertical short, 1:30. The documents behind Milner Gas Power Plant video 2, on screen: the 60 megawatt Milner battery bid, the request for updated pricing that brought back gas engines of up to 222 megawatts, and PUC staff comments and Commission orders on competitive bidding. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-02-bid-as-a-battery-swapped-for-gas-v1-19mb-ea9df6.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.6 MB | November 19, 2026 |
Milner Evidence Short 3: The Name Missing From the State's NoticesSeries: South Hills - Milner Project · Part 5Vertical short, 1:23. The documents behind Milner Gas Power Plant video 3, on screen: Idaho Power's testimony on why the project was renamed South Hills, and the PUC notices in case IPC-E-26-04 that never say Milner or Twin Falls County. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-03-the-name-missing-from-the-states-notices-v1-19mb-5112f4.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.7 MB | November 19, 2026 |
Milner Evidence Short 4: Largest Customers Drive 88% of the GrowthSeries: South Hills - Milner Project · Part 6Vertical short, 1:26. The documents behind Milner Gas Power Plant video 4, on screen: PUC staff's math on Idaho Power's own load forecast, with the largest-customer class making up 88 percent of growth between 2026 and 2030. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-04-largest-customers-drive-88-percent-of-the-growth-v1-19mb-d0b215.mp4 · DownloadPlay | Video | Energy, Hyperscale, Local & State | MP4 | 17.7 MB | November 19, 2026 |
Milner Evidence Short 5: A New Gas Pipeline, and Eminent Domain if ApprovedSeries: South Hills - Milner Project · Part 7Vertical short, 1:26. The documents behind Milner Gas Power Plant video 5, on screen: FERC's Federal Register notice for the Dec. 9 Silver Spur scoping session at Magic Valley High School in Twin Falls, docket PF26-15. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-05-a-new-gas-pipeline-and-eminent-domain-if-approved-v1-19mb-02fd4a.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.6 MB | November 19, 2026 |
Milner Evidence Short 6: Solar Needed a Hearing. The Gas Plant Hasn't Had One.Series: South Hills - Milner Project · Part 8Vertical short, 1:26. The documents behind Milner Gas Power Plant video 6, on screen: the PUC's notice of modified procedure in IPC-E-26-04, which says the public interest may not require a formal hearing. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-06-solar-on-potato-cellars-needed-a-hearing-the-gas-plant-hasnt-had-one-v1-19mb-6acd8e.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.6 MB | November 19, 2026 |
Milner Evidence Short 7: Money Down on Engines Before the State RuledSeries: South Hills - Milner Project · Part 9Vertical short, 1:24. The documents behind Milner Gas Power Plant video 7, on screen: Idaho Power's reply comments stating that a payment for the reciprocating engines for South Hills was made in June 2026, and the open state case. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-07-money-down-on-engines-before-the-state-ruled-v1-19mb-837337.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
Milner Evidence Short 8: Agencies Got 60 Days. Neighbors Weren't on the List.Series: South Hills - Milner Project · Part 10Vertical short, 1:23. The documents behind Milner Gas Power Plant video 8, on screen: how a federal dam license and its project boundary work, and Idaho Power's FERC request on docket P-2899-157. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-08-agencies-got-60-days-neighbors-werent-on-the-list-v1-19mb-9f080a.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.6 MB | November 19, 2026 |
Milner Evidence Short 9: Twelve Stacks, No Emissions NumbersSeries: South Hills - Milner Project · Part 11Vertical short, 1:22. The documents behind Milner Gas Power Plant video 9, on screen: what Idaho's air rule, IDAPA 58.01.01.201, requires before construction, and Idaho Power's project page on when DEQ would issue the permit. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-09-twelve-stacks-no-emissions-numbers-v1-19mb-d2756a.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.6 MB | November 19, 2026 |
Milner Evidence Short 10: The Deadlines You Can Still MakeSeries: South Hills - Milner Project · Part 12Vertical short, 1:28. The documents behind Milner Gas Power Plant video 10, on screen: the Dec. 9 Silver Spur session, Dec. 14 comment deadlines in PF26-15 and IPC-E-26-07, and the FERC docket open for comment. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-10-the-deadlines-you-can-still-make-v1-19mb-76c343.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.5 MB | November 19, 2026 |
Milner Gas Plant: Next DoorSeries: South Hills - Milner Project · Part 13Vertical video, 1:41. Idaho Power's gas plant of up to 222 megawatts, now filed as South Hills, would sit on a 20-acre parcel next to Milner Dam. Idaho Power testified Twin Falls County requires only a building permit, and the farm zone rules the county adopted in August 2026 list public utility buildings as a permitted use. Twin Falls County commissioners: 208-736-4068. Narrated by Laurel, an ElevenLabs voice.milner-gas-plant-01-next-door-vertical-v2-laurel-19mb-2878f0.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 18 MB | November 22, 2026 |
Milner Gas Plant: Idaho Power Changed the NameSeries: South Hills - Milner Project · Part 14Vertical video, 1:38. The PUC's two formal notices never say Milner or Twin Falls County. The same plant went from "Milner 60 MW BESS" to "Milner gas resource" to "South Hills," the name of the mountains south of Twin Falls. To follow it, search both names in state case IPC-E-26-04. Narrated by Laurel, an ElevenLabs voice.milner-gas-plant-03-idaho-power-changed-the-name-vertical-v4-laurel-19mb-d27eb3.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 6 MB | November 22, 2026 |
Milner Gas Plant: 88 Percent From the Biggest CustomersSeries: South Hills - Milner Project · Part 15Vertical video, 1:52. Idaho Power says the plant serves the Magic Valley. Its own forecast, per PUC staff, has the largest-customer class growing from 258 to 875 average megawatts by 2030, 88 percent of all system growth, with Micron's fab about 445. Comments on large-load costs in IPC-E-26-07 are due Dec. 14. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-gas-plant-04-88-percent-big-customers-vertical-v4-laurel-19mb-7f2d58.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 5.9 MB | November 22, 2026 |
Milner Gas Plant: Eminent Domain on the Table, Dec. 9Series: South Hills - Milner Project · Part 16Vertical video, 1:48. The Silver Spur pipeline would run about 88 miles of 24-inch pipe from Elko County, Nevada, to Twin Falls County, with Idaho Power reported at 175,000 of about 275,000 dekatherms a day. FERC's scoping session is Dec. 9, 5 to 8 p.m., in Twin Falls; written comments are due Dec. 14 on docket PF26-15. Check the docket before you go. Narrated by Laurel, an ElevenLabs voice.milner-gas-plant-05-eminent-domain-on-the-table-vertical-v4-laurel-19mb-87c3ed.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 6.1 MB | November 22, 2026 |
Milner Gas Power Plant 1 of 10: Up to 222 Megawatts. Idaho Power Says the County Requires Only a Building Permit.Series: South Hills - Milner Project · Part 17Vertical video, 2:39. Idaho Power plans a natural gas plant of up to 222 megawatts on a pivot field just downstream from Milner Dam, now filed as South Hills: twelve engines in two engine halls on a 20-acre parcel. The project page promises noise-reduction measures and gives no decibel figure, and Idaho Power testified the county requires only a building permit. Twin Falls County commissioners: 208-736-4068. Narrated by Laurel, an ElevenLabs voice.milner-main-01-up-to-222-megawatts-idaho-power-says-the-county-requires-only-a-building-permit-v3-19mb-26f425.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
Milner Gas Power Plant 2 of 10: Bid as a Battery, Swapped for GasSeries: South Hills - Milner Project · Part 18Vertical video, 3:31. What competitive bidding is and why it matters, then what happened at Milner. Idaho Power's own bid team entered a 60 megawatt battery; after it made the shortlist, the bid came back as a gas plant of up to 222 megawatts. PUC staff says the company effectively bypassed the RFP selection process, and Idaho Power calls that incorrect. Staff still recommends approval, with a hard cap on costs. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-02-bid-as-a-battery-swapped-for-gas-v3-19mb-f43ed2.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.9 MB | November 19, 2026 |
Milner Gas Power Plant 3 of 10: The Name Missing From the State's NoticesSeries: South Hills - Milner Project · Part 19Vertical video, 2:33. The Public Utilities Commission's two formal notices on Idaho Power's gas plant at Milner Dam never use the word Milner or name Twin Falls County; the plant is filed as South Hills, a name Idaho Power testified it chose to prevent internal confusion with its Milner hydro plant. The South Hills are the mountains south of Twin Falls, while the site sits on the valley floor. Search both names; the state case is IPC-E-26-04. Narrated by Laurel, an ElevenLabs voice.milner-main-03-the-name-missing-from-the-states-notices-v3-19mb-4c3338.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
Milner Gas Power Plant 4 of 10: Largest Customers Drive 88% of the GrowthSeries: South Hills - Milner Project · Part 20Vertical video, 2:54. Idaho Power says its new gas plant at Milner serves Magic Valley customers. PUC staff found its largest-customer class grows from 258 to 875 average megawatts between 2026 and 2030, 88 percent of all growth on the system, with Micron's new chip plant alone adding about 445. The conservative principle is cost causation: customers who drive the need should pay for it. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-04-largest-customers-drive-88-percent-of-the-growth-v3-19mb-da58cd.mp4 · DownloadPlay | Video | Energy, Hyperscale, Local & State | MP4 | 17.9 MB | November 19, 2026 |
Milner Gas Power Plant 5 of 10: A New Gas Pipeline, and Eminent Domain if ApprovedSeries: South Hills - Milner Project · Part 21Vertical video, 2:45. The Silver Spur pipeline would run about 88 miles of 24-inch pipe from Elko County, Nevada, into Twin Falls County, and approval brings the right of eminent domain. Natural Gas Intelligence reported Idaho Power signed for 175,000 dekatherms a day of its roughly 275,000, and Idaho Power's testimony ties pipeline capacity to its new plants. FERC public session Wednesday, Dec. 9, 5 to 8 p.m., Magic Valley High School, 512 Main Avenue North, Twin Falls; comments by Dec. 14 on docket PF26-15. Narrated by Laurel, an ElevenLabs voice.milner-main-05-a-new-gas-pipeline-and-eminent-domain-if-approved-v3-19mb-fcea8f.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
Milner Gas Power Plant 6 of 10: Solar on Potato Cellars Needed a Hearing. The Gas Plant Hasn't Had One.Series: South Hills - Milner Project · Part 22Vertical video, 3:13. The gas plant at Milner, filed as South Hills, has had no public hearing on the record at the PUC or the county. The PUC set the case for a decision on written comments, and as of Nov. 19, 2026, no ruling had been posted on a July request for public hearings. Meanwhile about 110 kilowatts of solar on potato cellars near Hansen needed a conditional use permit and a hearing. Twin Falls County: 208-736-4068. PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-06-solar-on-potato-cellars-needed-a-hearing-the-gas-plant-hasnt-had-one-v3-19mb-45679d.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.9 MB | November 19, 2026 |
Milner Gas Power Plant 7 of 10: Money Down on Engines Before the State RuledSeries: South Hills - Milner Project · Part 23Vertical video, 2:34. Idaho Power's reply says a payment for the reciprocating engines for its Milner gas plant was made in June 2026, with the state case still open. It also wants customers charged construction interest back to December 2025. PUC staff wants interest to start only after an approval order, with a hard cap on what customers pay. From the free-market side, a company that bets early should carry that bet. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-07-money-down-on-engines-before-the-state-ruled-v3-19mb-791bfd.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.9 MB | November 19, 2026 |
Milner Gas Power Plant 8 of 10: Agencies Got 60 Days. Neighbors Weren't on the List.Series: South Hills - Milner Project · Part 24Vertical video, 2:32. On June 24, 2026, Idaho Power emailed a draft federal filing about its Milner plant site to nine people at eight organizations, including federal agencies, Idaho Fish and Game, Twin Falls Canal Company, two tribes and the State Historical Society, and gave them 60 days to comment. The filing asks to pull about a tenth of an acre out of the Milner hydro project boundary for the plant's fenced yard. Neighbors weren't on the list. Anyone can comment on FERC docket P-2899-157. Narrated by Laurel, an ElevenLabs voice.milner-main-08-agencies-got-60-days-neighbors-werent-on-the-list-v3-19mb-638b02.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
Milner Gas Power Plant 9 of 10: Twelve Stacks, No Emissions NumbersSeries: South Hills - Milner Project · Part 25Vertical video, 2:17. Idaho Power's Milner gas plant, filed as South Hills, has twelve engines and twelve exhaust stacks in its rendering, and no emissions numbers on its project page. As of Nov. 19, 2026, no air permit application for the plant appears on DEQ's public comment page, and Idaho's air rules bar construction without a permit to construct, with a few exceptions. Watch DEQ's page for "South Hills" or "Idaho Power Company"; a written request opens a comment period. Narrated by Laurel, an ElevenLabs voice.milner-main-09-twelve-stacks-no-emissions-numbers-v4-19mb-16f90c.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
Milner Gas Power Plant 10 of 10: The Deadlines You Can Still MakeSeries: South Hills - Milner Project · Part 26Vertical video, 1:52. The state comment period on the Milner gas plant closed July 31, but the calendar isn't empty: the Dec. 9 Silver Spur pipeline session in Twin Falls, Dec. 14 deadlines for pipeline comments and for public comments in the large-load cost case, FERC docket P-2899-157 at any time, the coming DEQ air permit, and 21 days to ask for reconsideration after a final order. Twin Falls County: 208-736-4068. PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-10-the-deadlines-you-can-still-make-v3-19mb-3b8d3a.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.6 MB | November 19, 2026 |
Milner Gas Power Plant, Part 1: What's Coming to Milner DamSeries: South Hills - Milner Project · Part 27Mini documentary, 5:54, widescreen. Part 1 of 4 on the gas plant of up to 222 megawatts that Idaho Power now calls South Hills, below Milner Dam: what is planned, why the name changed, the Silver Spur pipeline that would feed it, and what Idaho Power has said about who the power is for. Narrated by Laurel, an ElevenLabs voice.milner-mini-documentary-01-whats-coming-to-milner-dam-part-1-19mb-3a56b4.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
Milner Gas Power Plant, Part 2: The Normal Road, and the One Milner TookSeries: South Hills - Milner Project · Part 28Mini documentary, 8:05, widescreen. Part 2 of 4 walks through the normal permitting road for a power plant in Idaho (PUC certificate, county land use, air permit, federal license) and where the Milner project took a different path, including a draft federal filing sent to eight organizations with no county office and no neighbors. Narrated by Laurel, an ElevenLabs voice.milner-mini-documentary-02-the-normal-road-and-the-one-milner-took-part-2-19mb-ba7c39.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
Milner Gas Power Plant, Part 3: The Paper TrailSeries: South Hills - Milner Project · Part 29Mini documentary, 7:15, widescreen. Part 3 of 4 follows the paper trail on the Milner gas plant, with names and page numbers: testimony, staff comments, county records and the land transfer to Idaho Power, plus H.B. 911, the 2026 law that makes a new load of 50 megawatts or more responsible for its full cost of service. Narrated by Laurel, an ElevenLabs voice.milner-mini-documentary-03-the-paper-trail-part-3-19mb-4b9efa.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.9 MB | November 19, 2026 |
Milner Gas Power Plant, Part 4: Questions That Need AnswersSeries: South Hills - Milner Project · Part 30Mini documentary, 5:13, widescreen. Part 4 of 4 lists the open questions on the Milner gas plant, who should answer them and how to ask, from the PUC and Twin Falls County to DEQ's coming air permit. Questions put in writing become part of the record, answered or not. Narrated by Laurel, an ElevenLabs voice.milner-mini-documentary-04-questions-that-need-answers-part-4-19mb-22dc1a.mp4 · DownloadPlay | Video | Energy, Local & State | MP4 | 17.8 MB | November 19, 2026 |
| Milner Gas Power Plant: Accountability Findings, Executive SummarySeries: South Hills - Milner Project · Part 31Research file, status as of Nov. 18, 2026. Summarizes 21 findings from the public record on Idaho Power's 222 MW South Hills gas plant near Milner Dam, nine of them rated high severity.milner-accountability-findings-executive-summary-52b4c6.docx · Download | Document | Energy, Research | DOCX | 11 KB | November 23, 2026 |
| The Regulation of Energy Production in Twin Falls County (Rev. 1)Series: South Hills - Milner Project · Part 32Research brief current to Nov. 19, 2026. Traces the legislative history of Twin Falls County's energy rules and Ordinance 282, and tests whether the 222 MW South Hills gas plant near Milner Dam is subject to discretionary land-use review.milner-energy-production-brief-rev01-f054a7.docx · Download | Document | Energy, Local & State, Research | DOCX | 48 KB | November 23, 2026 |
| Milner Area Power Projects Briefing (Rev. 4)Series: South Hills - Milner Project · Part 33Briefing guide, status as of Nov. 18, 2026. Quick answers and the full record on the power projects around Milner Dam, including where the Idaho Public Utilities Commission case stands.milner-area-power-projects-briefing-rev-4-419438.docx · Download | Document | Energy, Local & State, Research | DOCX | 1.5 MB | November 23, 2026 |
| Milner Area Power Projects Briefing, Addendum A: Twin Falls County RecordsSeries: South Hills - Milner Project · Part 34Addendum to Briefing rev 4, status as of Nov. 18, 2026. What Twin Falls County's own records show about the Milner gas plant, what follows for neighbors and the county, and a legal and ethical analysis.milner-area-power-projects-briefing-rev-4-addendum-a-twin-falls-county-records-649d72.docx · Download | Document | Energy, Local & State, Research | DOCX | 22 KB | November 23, 2026 |
| Milner Gas Power Plant (South Hills): Briefing Addendum 1 (Rev. 2)Series: South Hills - Milner Project · Part 35Supplement to the Milner Area Power Projects Briefing rev 4, status as of Nov. 18, 2026. Collects what turned up after rev 4: the gap review downloads, the Twin Falls County records search and the gap audit.milner-gas-power-plant-south-hills-briefing-addendum-1-rev-2-943eb0.docx · Download | Document | Energy, Local & State, Research | DOCX | 31 KB | November 23, 2026 |
| Silver Spur and the South Hills Gas Plant: Research BriefSeries: South Hills - Milner Project · Part 36Compiled Nov. 20, 2026. Gas route, fuel math, pipeline capacity, equipment and timeline for the Silver Spur pipeline and Idaho Power's South Hills plant near Milner Dam.silver-spur-and-south-hills-research-brief-2026-11-20-baed4b.docx · Download | Document | Energy, Research | DOCX | 30 KB | November 23, 2026 |
| Twin Falls County Wrote Gas Out: Energy Code Brief (Rev. 1.2)Series: South Hills - Milner Project · Part 37Research brief and evidence record, Nov. 19, 2026. Shows how natural gas power plants dropped out of Twin Falls County's energy code between 2022 and 2026, and why the South Hills plant is moving ahead on a building permit alone.twin-falls-county-wrote-gas-out-energy-code-brief-rev-1-2-a9f4f3.docx · Download | Document | Energy, Local & State, Research | DOCX | 7.9 MB | November 23, 2026 |
| Milner -South Hills BriefingSeries: South Hills - Milner Project · Part 38The Milner gas power plant briefings compiled into one PDF, revision 3. Covers the plant proposed near Milner Dam, also known as the South Hills project, and the places where the public record on it conflicts.00-milner-briefings-compiled-rev-3-408db1.pdf · Download | Document | Daily News & Briefs, Energy, Research | 4.3 MB | November 23, 2026 |